Misplaced Pages

Hebbala metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Upcoming Namma Metro station under Blue Line

Hebbala
Namma Metro station
General information
LocationVayunandana Layout, Hebbal Kempapura, Bengaluru, Karnataka 560024
Coordinates13°02′39″N 77°35′34″E / 13.044287°N 77.592666°E / 13.044287; 77.592666
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line - Under Construction
Orange Line
Red Line - Approved
Platforms(TBC)
Tracks(TBC)
ConnectionsBus interchange Hebbala BMTC Terminus
Mainline rail interchangeHebbala Suburban Station  Mallige 
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Bicycle facilities(TBC)
Accessible(TBC)
ArchitectNagarjuna Constructions Company Ltd. (NCC Ltd).
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 16 months' time (June 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Kempapuratowards Krishnarajapura or Central Silk Board Blue Line(Operational around June 2026) Kodigehallitowards KIAL Terminals
Future Service
Patelappa Layouttowards JP Nagar 4th Phase Orange Line(Approved) KempapuraTerminus
Terminus Red Line(Planned) Veterinary Collegetowards Sarjapura
Route map
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Legend
Blue Line to Krishnarajapura
or Central Silk Board
Blue Line Kempapura Blue Line Under construction
Blue Line
Red Line
Hebbala
(Red Line - Proposed)
Blue Line towards KIAL Terminals Red Line towards Sarjapura
Nagashetty Halli
BEL Circle
Muthyalanagar
Indian Railways Towards
Left arrow Tumakuru and Yesvantpur Jn Right arrow
Green Line Peenya
Kanteerava Nagar Hosahalli Purple Line
Freedom Fighter's Colony KHB Layout
Prem Nagar Kamakshi Palya
Sumanahalli Cross
Anjana Nagar Nagarbhavi BDA Complex
Mainline rail interchange Sunkadakatte Depot (U/C) Papireddy Palya
Herohalli Vinayaka Layout
Byadarahalli Nagarbhavi Circle
Indian Railways Towards
Left arrow Kengeri and KSR Bengaluru Right arrow
Kamath Layout Mysuru Road Purple Line
Kadabagere Dwaraka Nagar
Hosakerehalli
Kamakhya Bus Depot
Kadirenahalli
Jaya Prakash Nagar Green Line
JP Nagar 5th Phase
JP Nagar 4th Phase
Pink Line
Under construction
Legend:
Kempapura ⇔ JP Nagar Phase 4 (Corridor-1)
Sri Balagangadharanatha Swamiji Stn., Hosahalli ⇔ Kadabagere (Corridor-2)
Legend
Blue Line towards KIAL Terminals
Hebbala
Blue Line
Orange Line
Indian Railways Towards
Left arrow Yesvantpur Jn or SMVT Bengaluru UpperRight arrow
Ganga Nagar
Veterinary College
Mekhri Circle
Guttahalli Palace
Bengaluru Golf Course
Basaveshwara Circle
KR Circle
Town Hall
Shanthinagar
NIMHANS
Dairy Circle
Pink Line
Under construction
Koramangala II Block
Koramangala III Block
Jakkasandra
Blue Line towards
Central Silk Board
Agara
Blue Line
Under construction
Ibbaluru
Blue Line
Under construction
Blue Line towards
Krishnarajapura or KIAL Terminals
Bellandur Gate
Kaikondrahalli
Doddakannelli
Indian Railways Towards
Left arrow Hosur or Baiyyappanahalli Right arrow
Carmelaram
Ambedkar Nagar
Kodathi Gate
Muthanalluru Cross
Dommasandra
Sompura
Kada Agrahara Road
Mainline rail interchange Sarjapura Depot (TBC)
Sarjapura
Location

Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station is slated to become operational around June 2026.

History

Blue Line

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Hebbala metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Blue Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
Legend
to Kodigehalli
P#P#
to Kempapura Orange Line **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → KIAL Terminals
Next Station: Kodigehalli
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Kempapura
Change at the next station for Orange Line
Side platform | Doors will open on the left Disabled access
L2

Orange Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
Legend
to Kempapura Blue Line **
P#P#
to Patelappa Layout **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Kempapura
Change at the next station for Blue Line
Platform #
Westbound
Towards ← JP Nagar 4th Phase
Next Station: Patelappa Layout
Side platform | Doors will open on the left Disabled access
L2

Red Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
Legend
to Train Terminates Here
P#P#
to Ganga Nagar **
Station with two tracks and two side platforms
** Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Train Terminates Here
Platform #
Southbound
Towards ← Sarjapura
Next Station: Ganga Nagar
Side platform | Doors will open on the left Disabled access
L2

Connections

This section is empty. You can help by adding to it. (May 2024)

Entry/Exit

This section is empty. You can help by adding to it. (May 2024)

See also

Portals:

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.

External links

Namma Metro
Blue Line 5
Phase-2A
Phase-2B
Not In scope
  • ** Line(s) and stations which are approved & under construction
Orange Line 6 **
ORR-West Line
Hosahalli-Kadabagere Line
Red Line 7 **
  • Hebbala
  • Ganga Nagar
  • Veterinary College
  • Mekhri Circle
  • Guttahalli Palace
  • Bengaluru Golf Course
  • Basaveshwara Circle
  • KR Circle
  • Town Hall
  • Shanthinagar
  • NIMHANS
  • Dairy Circle
  • Koramangala II Block
  • Koramangala Ill Block
  • Jakkasandra
  • Agara
  • Ibbaluru
  • Bellandur Gate
  • Kaikondrahalli
  • Doddakannelli
  • Carmelaram
  • Ambedkar Nagar
  • Kodathi Gate
  • Muthanalluru Cross
  • Dommasandra
  • Sompura
  • Kada Agrahara Road
  • Sarjapura
Depot(s)
  • Baiyappanahalli & Doddajala
  • Sumanahalli (TBC)
  • Sarjapura (TBC)
See also
*Stations in italics are Under Construction
Categories: