Misplaced Pages

Jōyō (nuclear reactor)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Test sodium-cooled fast reactor in Ōarai, Ibaraki, Japan
This article needs to be updated. Please help update this article to reflect recent events or newly available information. (October 2017)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Jōyō" nuclear reactor – news · newspapers · books · scholar · JSTOR (December 2017) (Learn how and when to remove this message)
Experimental Fast Reactor Jōyō
Made based on National Land Image Information (Color Aerial Photographs), Ministry of Land, Infrastructure, Transport and Tourism

Jōyō (常陽) is a test sodium-cooled fast reactor located in Ōarai, Ibaraki, Japan, operated by the Japan Atomic Energy Agency. The name comes from the previous country name of the area around Ibaraki.

It was made with the purpose of doing tests on and advancing the development of that type of reactor, as an irradiation test facility for construction materials. It also does tests with the nuclear fuel as well as activation experiments.

The reactor has gone through 3 different core changes.

  • MK-I April 24, 1977 - January 1, 1982 (the power was 50-75 MWt)
  • MK-II November 22, 1982 - September 12, 1997. This core surpassed 50,000 hours of operating time with 100 MWt.
  • MK-III July 2, 2003–2007 (140-150 MWt).

The current core provides the neutron flux of 4×10 cms for E>0.1 MeV.

After an incident in 2007, the reactor is suspended for repairing, recovery works were planned to be completed in 2014.

Following the closure of the unsuccessful follow-on fast breeder reactor Monju in 2016, a decision was made to continue research at Jōyō.

On May 24, 2023 the Nuclear Regulation Authority approved a draft report on the safety screening of the reactor which concludes that the countermeasures implemented against sodium fires or core damages meet the new safety standards. The draft is expected to be formally approved after soliciting public comments.

See also

References

  1. "Japan to continue fast reactor development without Monju". Nuclear Engineering International. 4 October 2016. Retrieved 29 December 2017.
  2. "Japan nuclear regulator likely to approve restart of Joyo reactor". NHK World Japan. 25 May 2023. Retrieved 25 May 2023.

External links

Nuclear power in Japan
Reactors
(Active) LWR
Hokkaido
Tohoku
TEPCO
Chubu
Hokuriku
Kansai
Chugoku
Shikoku
Kyushu
JAPC
Closed
Canceled
Under construction
Other
Organisations
Regulatory bodies
Companies
Research institutions
Other
Accidents
Anti-nuclear
movement

36°16′05″N 140°33′15″E / 36.268039°N 140.554093°E / 36.268039; 140.554093


Stub icon

This article about nuclear power and nuclear reactors for power generation is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This article about a Japanese building- or structure-related topic is a stub. You can help Misplaced Pages by expanding it.

Categories: