Misplaced Pages

Line 2 (Surat Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Mass transit system in Gujarat, India

Green Line
Overview
StatusUnder construction
LocaleSurat, Gujarat, India
Termini
  • Bhesan
  • Saroli
Stations18
Service
TypeRapid transit
SystemSurat Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockTitagarh Rail Systems
Technical
Line length18.74 km (11.64 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map

Legend
Bhesan
Botanical Garden
Ugat Varigruh
Palanpur Road
LP Savani School
Performing Art Centre
Adajan Gam
Jagdishchandra Bose Aquarium
Badri Narayan Temple
Athwa Chopati
Majura Gate Subway interchange Red Line (Under construction)
Udhna Darwaja
Kamela Darwaja
Anjana Farm
Model Town
Magob
Bharat Cancer Hospital
Saroli

Line 2 of Surat Metro also known as The Green Line (Line 2) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, in the state of Gujarat, India.

This line consists of 20 metro stations from Bhesan to Saroli with a total distance of 18.74 km. It is expected to be operational by December 2027.

List of stations

Following is a list of stations on this route:

Green Line
# Station Name Opening Connections Layout
English Gujarati
1 Bhesan ભેસાણ Under construction None Elevated
2 Botanical Garden બોટનિકલ ગાર્ડન Under construction None Elevated
3 Ugat Varigruh ઉગત વરિગૃહ Under construction None Elevated
4 Palanpur Road પાલનપુર રોડ Under construction None Elevated
5 LP Savani School એલ.પી.સવાણી સ્કૂલ Under construction None Elevated
6 Performing Art Centre પર્ફોર્મિંગ આર્ટ સેન્ટર Under construction None Elevated
7 Adajan Gam અડાજણ ગામ Under construction None Elevated
8 Jagdishchandra Bose Aquarium જગદીશચંદ્ર બોસ એક્વેરિયમ Under construction None Elevated
9 Badri Narayan Temple બદરી નારાયણ મંદિર Under construction None Elevated
10 Athwa Chopati અઠવા ચોપાટી Under construction None Elevated
11 Majura Gate મજુરા ગેટ Under construction Red Line (Under construction) Elevated
12 Udhna Darwaja ઉધના દરવાજા Under construction None Elevated
13 Kamela Darwaja કમેલા દરવાજા Under construction None Elevated
14 Anjana Farm અંજના ફાર્મ Under construction None Elevated
15 Model Town મોડલ ટાઉન Under construction None Elevated
16 Magob મગોબ Under construction None Elevated
17 Bharat Cancer Hospital ભારત કેન્સર હોસ્પિટલ Under construction None Elevated
18 Saroli સારોલી Under construction None Elevated

See also

References

  1. PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
  2. "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. 13 July 2023. Retrieved 5 September 2023.
  3. "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. 12 July 2023. Retrieved 5 September 2023.
Portals:
India Urban rail transit in India
Suburban
rail
Operational
Under
construction
Planned
Proposed
Rapid
transit
Operational
Under
construction
Planned
Proposed
Monorail
Operational
Proposed
Cancelled
Metrolite
Planned
Proposed
Tram
Operational
Defunct
Categories: