Maracanã | |
Class overview | |
---|---|
Name | Macaé class |
Builders | AMRJ, INACE |
Operators | Brazilian Navy |
Preceded by | Grajaú class |
Succeeded by | Navio Patrulha de 500 Toneladas |
In commission | 2009–present |
Building | 2 |
Completed | 3 |
Active | 3 |
General characteristics | |
Type | Offshore patrol vessel |
Displacement | 500 tons |
Length | 55.6 m (182 ft 5 in) |
Beam | 9.3 m (30 ft 6 in) |
Draught | 2.5 m (8 ft 2 in) |
Propulsion | 2 × MTU 16V 4000 M90 |
Speed | 21 knots (39 km/h; 24 mph) |
Range | 2,500 nmi (4,600 km; 2,900 mi) at 15 knots (28 km/h; 17 mph) |
Complement | 35 |
Sensors and processing systems |
|
Armament | |
Notes | Sources: |
The Macaé class are a series of offshore patrol vessels being built for the Brazilian Navy by Arsenal de Marinha do Rio de Janeiro.
History
The class was based on the CMN Vigilante 400 CL54 design. The first two Macaé-class ships were built by INACE, following a 2006 contract. It was delivered in 2012, while the second ship was delivered in 2010.
The construction of Maracanã and Mangaratiba was halted in the mid-2010s, and restarted in the early 2020s. The laid down of Miramar took place in November 2024.
Ships of the class
Name | Hull no. | Builder | Laid down | Commissioned |
---|---|---|---|---|
Macaé | P70 | INACE | 24 November 2006 | 13 December 2009 |
Macau | P71 | 17 July 2007 | 30 November 2010 | |
Maracanã | P72 | AMRJ | 25 November 2009 | 7 September 2022 |
Mangaratiba | P75 | 19 December 2013 | Planned 2025 | |
Miramar | P76 | 28 November 2024 | Planned 2028 |
References
- "Integrated Bridge Systems for New Brazil Navy Patrol Boats". Sperry Marine. Archived from the original on 25 July 2011. Retrieved 6 February 2010.
- "Brazil set to procure BAE Systems Bofors 40 mm weapons". Janes. Retrieved 6 May 2015.
- Salles, Felipe. "Novos NPas de 500 toneladas já tem nomes e designadores definidos". www.alide.com.br. Retrieved 23 August 2022.
- "Macaé-Class Patrol Vessels, Brazil". Naval Technology. Retrieved 23 August 2022.
- ^ "Com verbas do PAC, Marinha inicia construção do 5º navio-patrulha da classe Macaé". Agência Brasil (in Portuguese). 28 November 2024.
- Padilha, Luiz (4 May 2022). "NPa Maracanã (P 72) será entregue em 7 de setembro". defesaaereanaval.com.br (in Portuguese). Retrieved 7 September 2022.
- Padilha, Luiz (19 December 2013). "Marinha do Brasil vai realizar o Batimento de Quilha do NPa 'Magé'". defesaaereanaval.com.br (in Portuguese). Retrieved 26 November 2024.
Ship classes of the Brazilian Navy | ||
---|---|---|
submarines | ||
helicopter carrier | ||
frigates | ||
corvettes | ||
landing platform docks | ||
patrol boats | ||
minesweepers | ||
replenishment tanker | ||
submarine rescue ship | ||
Icebreakers |
| |
research ships |
| |
training ships |
| |
tugboats |
| |
S: single ship |
This article about a specific naval ship or boat is a stub. You can help Misplaced Pages by expanding it. |
This biographical article related to the military of Brazil is a stub. You can help Misplaced Pages by expanding it. |