The topic of this article may not meet Misplaced Pages's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted. Find sources: "Optimus" ship – news · newspapers · books · scholar · JSTOR (August 2023) (Learn how and when to remove this message) |
Optimus in the background in Old City Harbour | |
History | |
---|---|
Name | Optimus |
Owner | Eesti Gaas |
Port of registry | Latvia |
Builder | Damen Shipyard |
Laid down | 17 May 2019 |
Launched | 8 September 2020 |
Christened | 3 November 2021 |
Completed | 2021 |
In service | 19 March 2021 |
Identification |
|
Fate | In service |
General characteristics | |
Tonnage | 6,357 GT |
Length | 99.8 m (327 ft 5 in) |
Beam | 18.6 m (61 ft 0 in) |
Draught | 5.0 m (16 ft 5 in) |
Depth | 9.4 m (30 ft 10 in) |
Ice class | 1A |
Installed power | 2 × 1480 kW |
Speed | 13.4 knots |
Capacity | 6,000 m (210,000 cu ft) storage (LNG) |
Crew | 16 |
Optimus is a LNG bunkering ship which is owned by Eesti Gaas. The LNG vessel is operated by Eesti Gaas group business unit Elenger Marine. Optimus is the first LNG bunkering ship in the Baltic Sea.
The ship was ordered by Elenger for bunkering services for Tallink newbuild LNG fueled ships Megastar and MyStar. The first bunkering for Optimus was in November 5 in 2021 when it was bunkering Tallink Megastar.
References
- marinetraffic.com Ship OPTIMUS (Bunkering Tanker)
- "Eesti Gaas esitles Vanasadamas veeldatud maagaasi (LNG) punkrilaeva". 4 November 2021. Retrieved 26 May 2023.
- "The LNG bunker vessel Optimus started operations". 5 November 2021. Retrieved 26 May 2023.