Misplaced Pages

Parijaata line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Planned suburban rail line in Bengaluru, India

Parijaata line
Overview
Native namePārijāta mārga
OwnerIndian Railways
Termini
Stations14
Service
TypeCommuter rail
Operator(s)Bengaluru Suburban Rail Company Limited
Depot(s)TBD
History
Planned openingJune 2029; 4 years' time (June 2029)
Technical
Line length35.52 km (22.07 mi)
Number of tracksDouble-track
CharacterElevated and at-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC overhead catenary

The Parijaata line is a planned Bengaluru Suburban rail line between Kengeri and Whitefield. The 35 km (22 mi) long broad-gauge line was approved in 2019. The line which is also referred as 'corridor-3' is awaiting for construction works. It is named after the flower Parijaata (Nyctanthes arbor-tristis) in Kannada.

History

The route between Kengeri and Whitefield, proposed by RITES in 2018 was approved on 7 October 2020 by government of India along with three other corridors of Bengaluru suburban rail project. The line was then named after the regional flower's Kannada name Parijaata. In 2024, amidst the surfacing of talks regarding shelving of the project, minister for railways in Karnataka, V Somanna responded that the Mallige (line 2) along with Kanaka (line 4) were prioritised over Sampige (line 1) and Parijaata. Since almost entirety of the Parijaata route ran along exisitng Purple line of Namma Metro.

In December 2024, Rajkumar Dugar, founder and convenor of Citizens for Citizens (C4C), proposed splitting of the construction of line in two segments C3A and C3B, with C3A running from Kengeri to Bangalore Cantonment railway station and C3B from Cantonment to Whitefield, while prioritising C3A as it was said to become the fourth railway terminal of the city.

The line is planned to be opened by June 2029 along with Sampige.

Stations

Parijaata Line
# Station Name Opening Connections / Transits / Terminals Station Layout Platform Level Type
English Kannada
1 Kengeri ಕೆಂಗೇರಿ June 2029 Bus interchange Kengeri TTMC TBD Side
2 RV College ಆರ್.ವಿ. ಕಾಲೇಜು
3 Jnanabharathi ಜ್ಞಾನಭಾರತಿ Purple Line
4 Nayandahalli ನಾಯಂಡಹಳ್ಳಿ
5 Krishnadevaraya ಕೃಷ್ಣದೇವರಾಯ
6 Jagajevanarama Nagara ಜಗಜೀವನರಾಮ ನಗರ
7 KSR Bengaluru ಕ್ರಾ.ಸಂ. ಬೆಂಗಳೂರು Purple Line
 Sampige  (Planned)
8 Kumara Park ಕುಮಾರ ಪಾರ್ಕ್
9 Cantonment Railway Station ದಂಡು ರೈಲ್ವೇ ನಿಲ್ದಾಣ Pink Line
10 Bengaluru East ಪೂರ್ವ ಬೆಂಗಳೂರು
11 Baiyyappanahalli ಬೈಯ್ಯಪ್ಪನಹಳ್ಳಿ Purple Line
New station ಹೊಸ ನಿಲ್ದಾಣ
12 Krishnarajapura ಕೃಷ್ಣರಾಜಪುರ Purple Line
Blue Line (Under-construction)
13 Hoodi ಹೂಡಿ
14 Whitefield ವೈಟ್ಫೀಲ್ಡ್ Blue Line (Under-construction)

See also

References

  1. ^ Lalitha, S. (5 December 2024). "Partial opening only of two suburban rail corridors by early 2027". The New Indian Express. Retrieved 17 January 2025.
  2. "Centre approves Bengaluru suburban rail project". Deccan Herald. Retrieved 16 January 2025.
  3. Philip, Christin Mathew (6 March 2021). "Bengaluru suburban rail corridors likely to be named after flowers". The Times of India. Retrieved 10 July 2021.
  4. "Bengaluru Suburban Railway Project: 'Corridors 2 and 4 are priority now,' says minister V Somanna amid talks on axing Corridor 3". The Indian Express. 28 November 2024. Retrieved 15 January 2025.
  5. Sridhar, Sridhar Vivan. "Land acquisition begins for suburban rail corridor-2". Bangalore Mirror. Retrieved 17 January 2025.

External links

Categories:
Parijaata line Add topic