This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources. Find sources: "SS Hat Creek" – news · newspapers · books · scholar · JSTOR (October 2024) |
History | |
---|---|
United States | |
Name | SS Hat Creek |
Namesake | Hat Creek |
Builder | Alabama Drydock and Shipbuilding Company, Mobile, Alabama |
Yard number | 251 |
Laid down | 1943 |
Launched | 30 April 1943 |
Identification | IMO number: 5015062 |
Fate | Scrapped 1983 |
General characteristics | |
Type | T2-SE-A1 tanker |
Tonnage | 12532 |
Displacement | 21,880 long tons (22,231 t) |
Length | 523 ft (159 m) |
Beam | 68 ft (21 m) |
Draft | 30 ft (9.1 m) |
Installed power | 7,240 shp (5,399 kW) |
Propulsion | turbo-electric transmission, single screw |
Speed | 15 knots (28 km/h; 17 mph) |
Range | 12,600 nmi (23,300 km) |
SS Hat Creek was a Type T2-SE-A1 tanker built at Alabama Drydock and Shipbuilding Company of Mobile, Alabama in July 1943. She was built as hull number 251 and USMC number 5354. She was sold in 1946 to National Bulk Carriers and a year later had a new two cylinder steam turbine installed. In 1957 she had a new middle section installed and was renamed Amoco Virginia. Subsequent renamings included Point Judy (1979) and Point Milton (1980).
Parts of the middle section were converted into deck barges and named Venemac 5 and Venemac 6.
References
This merchant ship article is a stub. You can help Misplaced Pages by expanding it. |