Misplaced Pages

Tengah MRT station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Not to be confused with Tengah Park MRT station. Future Mass Rapid Transit station in Singapore

Tengah  JS3 

登加
தெங்கா
Future Mass Rapid Transit (MRT) interchange and terminus
Tengah MRT station site behind the trees
General information
Location51 Tengah Central
Singapore 689979
Coordinates1°21′59″N 103°43′48″E / 1.36633°N 103.73007°E / 1.36633; 103.73007
Owned byLand Transport Authority
Line(s)  Jurong Region Line
Platforms4 (2 island platforms)
Tracks5 (including one reception track to/from Tengah depot)
Construction
Structure typeElevated
Platform levels2
Bicycle facilitiesYes
AccessibleYes
History
Opening2027; 2 years' time (2027)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Choa Chu Kang Westtowards Choa Chu Kang Jurong Region LineFuture service Hong Kahtowards Boon Lay
Terminus Tengah Plantationtowards Pandan Reservoir
Location
Singapore MRT/LRT system mapSingapore MRT/LRT system mapTengahTengah station in Singapore

Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

It will be the northern terminus of the East Branch of the Jurong Region line, allowing passengers on the East Branch to change trains for Main Branch train services. Trains entering service at this station will terminate at Pandan Reservoir.

History

On 9 May 2018, LTA announced that Tengah station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027.

Contract J102 for the design and construction of Tengah Station and associated viaducts was awarded to Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd at a sum of S$465.2 million (US$337.6 million in 2024). Construction will start in 2020, with completion in 2027. The contract also includes the design and construction of Choa Chu Kang station and Choa Chu Kang West station, and associated viaducts and A&A works to the existing Choa Chu Kang station complex.

Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027.

Location

The station will be co-located with Tengah Mall and Tengah Bus Interchange (Integrated Transport Hub), one of the basic necessities for Tengah to thrive as a new town.

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  2. "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  3. "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  4. "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  5. "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  6. "Tender information | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  7. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 19 February 2021. Retrieved 24 March 2021.
  8. "A peek into Tengah, the next new HDB town the size of Bishan". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  9. "Singapore's Tengah Planning Area". Key Location. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
Singapore Mass Rapid Transit (MRT) stations in Singapore
Italicised locations are currently not in operation
Jurong Region Line
Stage 1 (2027)
Stage 2 (2028)
Stage 3 (2029)
Depot(s)
Categories:
Tengah MRT station Add topic